Page 268 - IRSEM_Main Book
P. 268

Example of Fault
                           Fault Name            Ref:                     Fault Information                     Momentary  Confirmed
                                                                                                                                                Message
                                                        If the train arrives on the track2 proving the sequence
                                                        of  track1  DN  and  ahead  track  to  point  zone  track  is   M
              20  Point Burst                   RDSO                                                                          C (120 Sec)  101 Point Burst
                                                        down,  the  point  setting  in  the  unfavourable  position
                                                        and then the NWKR/RWKR both are DN for 2min.
                                                        At the time of HR/DR/ HECR/DECR up, signal lock relays                             S1 Signal Cleared
              21   Clearing of Signal without   RDSO  i.e all G(R)LR's/G(R)R/ASR/ALSR in the possible Routes                       C       without Route
                   Route Locking
                                                        from signal are in down state  then it is Failure.                                 Locking
                                                        The TIME difference between JSLR UP and NJPR UP is
                                                                                                                                           S1 Timer setting
              22  Timer setting Less            RDSO  less by more than 10% (less than 108 seconds for 120                         C       Less
                                                        seconds timer) of the prescribed time.




































                                                              Chapter 11: Dataloggers and Predictive Maintenance Systems                           Page 229 of 535
   263   264   265   266   267   268   269   270   271   272   273