(j)  Locking shall be refitted carefully. Before replacing the covers, the locking
                             shall be again powdered with graphite. Thin mineral oil shall be used for
                             lubrication when graphite is found unsuitable owing to climatic conditions.

                         (k) It shall be ensured that waste cotton pieces or any other foreign materials
                             are not left inside the locking boxes.


                         (l)  Before  replacing  the  covers,  the  locking  shall  be  carefully  checked  with
                             the approved locking diagram.

                12.25.6  Resumption of normal working


                         (a) It will be personal responsibility of the Supervisory SSE/JE (Signal) to test
                             all  interlocking  frames  up  to  20  working  levers  after  completion  of
                             overhauling  and  to  introduce  normal  working.  As  regards  interlocking
                             frames with 21 to 30  working levers, normal  working can  be introduced
                             after  completion  of  overhauling  and  testing  of  interlocking  by  the
                             Supervisory SSE/JE (Signal). The DSTE/ADSTE must, however test the
                             locking as soon as possible after normal working has been resumed by
                             the Supervisory SSE/JE (Signal).

                         (b) When the lever frame to be overhauled is more than 20 working levers, as
                             soon as the overhauling work has been completed, it will be the personal
                             responsibility of the SSE/JE(Signal)/incharge to intimate the Signal Officer
                             concerned that the interlocking frame is ready for his test.

                         (c) In regard to interlocking frames with more than 30 working levers, it will be
                             the personal responsibility of the Signal Officer concerned to test all such
                             interlocking  frames  after  completion  of  overhauling  and  to  introduce
                             normal working.


                         (d) The  testing  referred  to  in  para  12.26.7  shall  be  carried  out  as  per
                             approved locking table.

                         (e) The Sr.DSTE/DSTE/ADSTE must keep in close touch with the progress of
                             the overhauling work and see that the duration of the work is reduced to
                             what is actually necessary to avoid undue continuance of the restrictions
                             imposed on the traffic working.

                12.25.7  Overhauling of Interlocking Key Boxes

                         (a) Interlocking  Key  Boxes  must  be  overhauled  under  the  personal
                             supervision of the SSE/JE(Signal)/incharge.

                         (b) Disconnection Memo on Form S&T/DN (Annexure: 3-A10) shall be issued
                             by the SSE/JE (Signal) to the Station Master on duty and  his signature
                             obtained before starting and reconnection memo issued after completion
                             of the overhauling work.


                         (c) The  responsibility for  the  safe  custody  of the  interlocking  keys  released
                             from the interlocking key box as long as the locking is disconnected shall
                             rest with the SSE/JE (Signal)/incharge.