12.21.6  Trimming of Trees Obstructing Visibility:  Where trees interfere with the Loco
                         Pilot's or cabin man's sighting of signals, the SSE/JE (Signal) shall arrange with
                         the SSE/JE (Works) for Trimming of tree branches or cutting of trees within the
                         Railway  boundary.  If  the  trees  are  in  private  land,  the  Sr.DSTE  or  DSTE  or
                         ADSTE incharge of the section shall be informed so that he may arrange through
                         Sr.DEN or DEN or ADEN for the removal or cutting of the trees.


                12.21.7  Artificial backgrounds

                         (a) Signals  may  be  provided  with  an  artificial  background  painted  white,  if
                             found  necessary  to  improve  the  sighting  or  when  the  background  is  a
                             bridge or structure, such portion as necessary to form a background, may
                             be painted white or be white washed.

                         (b) Arms provided with an artificial background shall project 150 mm beyond or be
                             provided with a tell tale arm so that it can be seen by the Station Master.

                12.21.8  Posts: Signal posts shall be kept plumb. Signal post guys, where provided
                         shall be kept tight and in good repair.

                12.21.9  Deck Boards: Deck boards on bracket posts and gantries shall be inspected to
                         detect decayed or loose boards. Missing or defective boards shall be replaced.

                12.21.10 Provision of Signal Dubbers and Kerosene:  Whenever kerosene lit signals
                         are provided, the signal dubbers and kerosene shall be provided by Traffic staff.

                12.21.11 Cleaning  of  Signal  Glasses  and  Lamp  Lenses:  The  Traffic  staff  are
                         responsible for wiping and cleaning of signal glasses, roundels, and lenses of
                         kerosene  lit  signals.  Roundels  of  electrically  lit  signals  shall  be  cleaned  by
                         signal staff.


                               Section 22: Maintenance of Point, Trap and Shunting
                                                     Permitted Indicators

                12.22.1  Type, Provision, Placing and Indication

                         (a) Point,  Trap  and  Shunting  Permitted  Indicators  shall  be  provided  in
                             accordance with the approved plans.

                         (b) Type, Provision, Placing and Indication of these indicators are covered in
                             detail in Chapter 7 of SEM.

                                            Section 23: Maintenance Schedule


                12.23.1  The  maintenance  schedule  for  various  items  of  'Mechanical  signalling
                         equipment shall be as in Annexure: 12-MS1. At stations having dense traffic
                         and high speeds, the Railways may prescribe more frequent inspections, if
                         considered necessary.







                              Chapter 12: Installation, Testing & Maintenance of Mechanical Signalling Equipment   Page 258 of 535