Page 294 - IRSEM_Main Book
P. 294
(f) All equipments as required to be provided by concerned Departments
including a clock, and
(g) A name board of sufficient size.
Note: The lever pull chart, referred in (2) above, need not be provided in Cabins
where the number of release lever concerned are indicated on the lever name plates
to guide the Cabin man in following the correct sequence for pulling the levers.
12.8.2 Numbering of levers: All levers, including spares, shall be numbered
consecutively through the frame from left to right. Each lever shall be
provided with a number plate. This will show the function in the order of
operation which must precede to release when no lever description board is
provided.
12.8.3 Cabins-Cleanliness, Repair and Fittings
(a) Ground floor of cabins shall be kept clean and tidy.
(b) Cabins including battery room and repair room shall be kept in good
condition and periodically painted/distempered. The roof shall be so
maintained as to prevent leakage. "Ghara" stands shall be kept properly
drained off. Wash basins, where provided, shall be kept in perfect repair.
Any repair required shall be promptly notified to the SSE/JE (Woks).
(c) SSE/JE (Signal) shall bring to the notice of his Sr.DSTE or DSTE or
ADSTE incharge of the section when repairs to cabin are delayed.
(d) Windows of cabins shall be kept clean. This is the duty of the operating staff.
(e) Each SSE/JE (Signal) shall see that the cabin diagram, pull chart, Cabin
man's instructions and Maintained programme provided in the Cabin are
up-to-date and their glazed frames are in proper repair.
Section 9: Maintenance of Lever Frame
12.9.1 Responsibility: Each SSE/JE (Signal) is personally responsible for efficient
maintenance of the locking of the interlocking frames under his charge.
Locking box covers shall be kept padlocked and sealed with his personal
seal supplied to him for the purpose.
12.9.2 Instructions for Technicians
(a) All accessible working parts of interlocking frames shall be thoroughly
lubricated and cleaned.
(b) All split pins shall be checked to ensure that they are intact and properly open.
Also all nuts and bolts shall be checked and tightened wherever necessary.
(c) Handles of levers of interlocking frames shall be kept clean and bright by
the Transportation Staff.
Chapter 12: Installation, Testing & Maintenance of Mechanical Signalling Equipment Page 248 of 535