5.3.8  Administrative  Control  on  Survey  Team:  The Signaling/Telecommunication
                       Survey team shall work under the Administrative and Technical Control of the
                       Principal  Chief  Signal  and  Telecommunication  Engineer  or  Chief  Signal  and
                       Telecommunication  Engineer  (Construction),  as  the  case  may  be,  both  for
                       Surveys for Signaling & Telecommunication works and for Signaling portion of
                       the Surveys for Projects mentioned in Para 5.3.7.


               5.3.9  Progress  Reports  on  Surveys:  The  Official  incharge  shall  submit  periodical
                       reports  of  progress  in  prescribed  forms  as  may  be  directed  by  the  Principal
                       Chief Signal and Telecommunication Engineer.

               5.3.10 Report: At the conclusion of the Survey, a report should be formulated by the
                       Officer incharge of the Survey. The details of the information collected, calculations
                       and diagrams, shall be embodied in Tables as Annexure to the Report. Inference
                       out of the Survey on the feasibility of the work with clear decision whether to take
                       up the work or drop it shall be brought out at the conclusion of the survey.

               5.3.11 Covering  Note:  The Survey Report and Annexures shall be submitted to the
                       Railway  Board  under  a  covering  note,  which  shall  have  the  authority  of  the
                       Railway Administration submitting the Report. It should provide a summing up
                       and  should  contain  clear  recommendation  together  with  the  views  of  the
                       Principal Financial Adviser (PFA).



                                       Note: This Chapter has under mentioned Annexures
                        S.No.    Annexure No.                        Description

                          1          5-A1         Preparation of the Preliminary Works Programme
                          2          5-A2         Test of Remunerativeness

                          3          5-A3         Code Rules for Estimates

                          4          5-A4         Grouping of Works